Site Supervisor
| Date : 23 May 2013 ![]() | ||||||||||||||||||
| Supervise site operation works. Liaise with site personnel such as Clerk of Works, Site Engineers and Subcontractors. Prepare relevant project reports and implement day-to-day activities as assigned by superior. ... | |||||||||||||||||||
Maintenance Technician / Chargeman (URGENT) at But...
| Date : 23 May 2013 | ||||||||||||||||||
| Performing maintenance, repairs, renovations and operation of buildings, equipment and system for the buildings, equipment and system for the purpose of asset preservation and providing a safe and functional environment. Diagnose malfunction and d... | |||||||||||||||||||
ENGINEER (C&S)
| Date : 23 May 2013 ![]() | ||||||||||||||||||
| Conduct studies and analysis on highway traffic engineering including accident and other trends and make recommendations to improve safety and traffic flow. Develop and implement plans on specifications, standards and proced... | |||||||||||||||||||
Asst QAQC Engineer
| Date : 23 May 2013 | ||||||||||||||||||
| • To assist the MR to maintain the company's ISO implementation. • To ensure the company's practices and procedures are compliance with the ISO requirements. | |||||||||||||||||||
Quantity Surveyors
| Date : 22 May 2013 ![]() | ||||||||||||||||||
| Responsible for taking-off quantities and preparation of bills of quantities Prepare contract documents, monitor progress and prepare progress report and progress claims to clients Perform monthly joint site progress evaluation P... | |||||||||||||||||||
Quantity Surveyor
| Date : 22 May 2013 ![]() | ||||||||||||||||||
| Develop and update project status information and monitoring systems Prepare preliminary cost estimates, bill of quantities and contract documentation Manage the issue of all project claims to clients Ensure all claims are being issued... | |||||||||||||||||||
|
Senior Interior Designer | Date : 22 May 2013 ![]() | ||||||||||||||||||
| Responsibilities: - Good skill in design sense & have great passion for interior design - To produce conceptual drawings for presentation to clients and working drawing... | |||||||||||||||||||
M&E coodinator
| Date : 22 May 2013 | ||||||||||||||||||
| To coordinate and monitor all M&E works for lifts, fire-fighting, cold water, sewerage, electrical works for high rise projects. Able to liase with M&E Consultants on technical matters. Able to prepare coordination drawings. | |||||||||||||||||||
Junior/ Senior Quantity Surveyor
| Date : 21 May 2013 | ||||||||||||||||||
| Preparation of feasibility studies, cost estimate and tender document. Review, evaluate and prepare tender reports. Establish and maintain accurate cost records, main document control and filing system. Review and advise Pro... | |||||||||||||||||||
Quantity Surveyor
| Date : 21 May 2013 | ||||||||||||||||||
| Pre-Contract · Preparing budget as requested by the Client. · Ensuring that the project executed is within the ... | |||||||||||||||||||